Storm Preparation, Friday, 8/26/2011

We have taken certain measures to protect the Sanctuary from the possible impact of hurricane Irene. These actions include closing all shutters and securing them with a board which crosses both shutters...

Read More

What’s New with Operations 8/18/11

Many projects have been completed since the last Operations’ Disciple Report. These are: Painting of the outside of the Sanctuary. Painting of the Memorial Garden including two peaks. Tarring of...

Read More

What’s New with Operations – May, 2011

What’s New with Operations? (4/24/11) Considerable progress has been made on our refurb of the front wall of the Sanctuary. All of the cracks have been opened, primed,  spackled with compound, fibrataped,...

Read More

Operations – April, 2011

(3/24/11) Many items of routine maintenance have been completed; including: re-nailing the roof flashing on the North end of Fellowship Hall, repair of several leaky toilets, resetting the temperature...

Read More

Operations — March 2011

Operations Commission All work has been completed in Room 16. A very big Thank You to Jose for doing all of the painting. Also, thanks  to Todd, Katherine Frase, Liam, Dick Hunter, Bud Coccodrilli, Mable,...

Read More

Operations — February 2011

What’s New with Operations? Great progress has been made in Room 16 which is heavy used by Noon Unity. The room has been completely redone; including painting, removal of the very old and stained carpet,...

Read More

:)