We are underway!
We have contracted with an architectural firm to provide us with accurate as-built drawings of the CE building, as well as proposals for how best to accomplish our Campaign goals most efficiently. We have also contracted with a roofer, to replace the entire CE building roof in anticipation of the solar panel installation, and with a siding company to replace the sanctuary exterior with a more durable material that will not require constant repainting.
We have received approval from Presbytery to apply for a low interest “Restoring Creation” loan to help with the roofing, siding and solar installation, through the Presbyterian Investment and Loan Program.
We anticipate being able to start the roof and siding projects in late June, so you will be seeing your campaign contributions at work!